Skip to main content

Operations & Maintanence

Johnstown North Metropolitan District 2025 Operations and Maintenance Plan 
[Schedules are subject to change]

 

January
•    Finalize O&M contracts.
•    Issue O&M Plan 
•    Begin monthly preventative maintenance on grinder pumps by Canyon Bakehouse

February
•    SWPPP manhole structure and storm structure maintenance as needed.
•    Ditch and detention area maintenance as needed

April
•    Activate irrigation system.
•    Turf aeration
•    Spring fertilization
•    Start right-of-way mowing.

May
•    Start non-pot meter readings and billings.

June
•    Plant replacements, if necessary
•    Refresh mulch beds
•    Irrigation backflow testing

July
•    O&M scope review/pricing requests
•    O&M services cost analysis

August
•    Draft 2026 O&M budget

September
•    Tree replacements, if necessary
•    Finish right-of-way mowing
•    O&M bidding process

October
•    Winterize the irrigation system.
•    Final non-pot meter readings and billings
•    Storm structure maintenance

November
•    Finalize 2026 O&M budget.

December
•    Update service area maps
•    Issue O&M contracts
•    Draft 2026 Operations Plan